Cabinets:
Display bookcase | 1 |
Computerized doll cabinet | 6 |
Base fiddle cabinet | 3 |
Cello rack | 1 |
Specialized classroom/office cabinets | 17 |
Double sided book cabinet | 4 |
Large book cabinets | 18 |
Display case for bookstore | 1 |
Register stand for bookstore | 1 |
Easel | 1 |
Desks:
1-person computer desk | 14 |
2-person computer desk | 805 |
3-person computer desk | 24 |
4-person computer desk | 14 |
Shelving:
Specialized storage room shelving | 14 |
Classroom shelves | 30 |
Instrument shelves-single sided | 5 |
Instrument shelves-double sided | 1 |
Library shelving (repair/build) | 6 |
Rough storage shelving | 640 sq. feet |
Storage room shelving | 24 + 480 sq. feet more |
Large storage room shelving | 5 |
Text book shelving | 13 + 27,000 books more |
Storage:
Specialized storage | 3 |
Personal lockers & benches | 1 |
Secure piano | 1 |
Sports equipment storage | 2 |
Misc. Builds:
Arbors with benches | 4 |
Aviation desks | 9 |
Benches | 68 |
Bathroom counter | 1 |
Concession stand | 1 |
Counters & cubicals | 6 |
Court rooms | 2 |
Cubbies | 1 |
Lab tables | 6 |
Lockers | 215 |
Nurses station | 1 |
Outdoor classroom setting | 3 |
Outdoor benches | 6 |
Picnic tables | 18 |
Picture frames | 2 |
Platform for filming games | 1 |
Podium | 1 |
Risers | 1 |
Rolling dry erase board | 1 |
Sandbox | 1 |
Shed | 1 |
Stage components | 1 |
Tables | 13 |
Wheelchair ramp | 2 |
Wheelchair ramp | 2 |
Workbenches | 15 |
Workstations | 53 |
Cafeteria | 3 |
Classrooms | 8 |
Concession stands | 1 |
Corridors | 5 |
Exterior doors | 1 |
Main entrance | 1 |
Office | 1 |
Picnic tables | 16 |
Stairwells | 2 |
Drafting tables | 8 |
Football field restrooms | 2 |
Outdoor lecture area | 1 |
Refinish lab workbenches | 16 |
Removed & replaced softball dugouts | 1 |
Repaired guttering & roofing gaps | 3 |
Repaired hinges & hasps locker room | 1 |
Repaired library chair & music racks | 2 |
Replaced damaged ceiling tile | 1 |
Replaced mechanical system – greenhouse | 1 |
Replaced lighting system – greenhouse | 1 |
Cleaned storage area | 1 |
Concrete landing – exterior | 1 |
Cut white board tablets | 520 |
Demolished & removed 4-ft tall partitions | 4 |
Demolish, repair & refinish flooring | 2 |
Design & build courtroom furniture | 1 |
Developed exterior drainage swale | 1 |
Installed acoustical ceiling | 1 |
Installed dry erase board | 1 |
Modified computer tables for security | 2 |
Moved PE lockers | 2 |
Reconfigure science lecture hall | 1 |
Remove drapes and hanging system | 1 |
Remove drywall and paint project | 1 |
Removed and replaced roof – greenhouse | 1 |
Roofed softball dugouts | 1 |
Tuck point wall | 1 |